OCP 11G认证考试

单选题If a job references a schedule that has been disabled, what will be the result?()A The job will be automatically disabled.B The job will never execute.C The job will attempt to execute but will fail.D The job will inherit the DEFAULT_SCHEDULE schedule.

题目
单选题
If a job references a schedule that has been disabled, what will be the result?()
A

The job will be automatically disabled.

B

The job will never execute.

C

The job will attempt to execute but will fail.

D

The job will inherit the DEFAULT_SCHEDULE schedule.

E

A schedule object cannot be disabled.

如果没有搜索结果,请直接 联系老师 获取答案。
更多相关问题