单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A
An additional switch for the new HMc
题目
单选题
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
A
An additional switch for the new HMc
B
Asynchronous adapters on the new HMc
C
The two 570 servers are directly connected to the new HMc
D
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc