CMS专题

单选题An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A An additional switch for the new HMc

题目
单选题
An administrator has an existing HMC and POWER6 570 connected to a network switch.  The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()
A

An additional switch for the new HMc  

B

Asynchronous adapters on the new HMc

C

The two 570 servers are directly connected to the new HMc  

D

One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc

如果没有搜索结果,请直接 联系老师 获取答案。
更多相关问题